Showing posts with label Bathrooms. Show all posts
Showing posts with label Bathrooms. Show all posts

Saturday, June 29, 2013

Catching up....

Back in January, our newly engaged daughter and her man let us know they wanted to have their wedding here at the farmhouse...and that she wanted to wear my dress!  Needless to say, we began making and revising our spring project list immediately.

First on the list was to make the bathroom downstairs presentable for 100 or so guests!  That poor bathroom has been on the project lists for each of the past 5 years but never seems to get any attention..that obviously had to change.  So in February, we did a quick makeover on it.  Check one item off the list.

Next was to finish up the long term Gazebo Project.  We actually began that project back in 2006, but like the bathroom, only parts of it were completed every year.  We knew that with a May wedding, it would need to be completely done to have a bug free zone for the catering.  So on went the Metal Roof.


And we began to work on the yard laying stone pathways and new sod. The first week of May was going to be spent finishing up all of these projects.  The screening and half walls were to go up on the Gazebo and the trailer filled with stone was parked where we normally parked our vehicles...everything was ready for the last push towards completion.....And then came the rain.

Three days of it.  Meteorologists were saying we had gotten three months of rain in those three days.  Our new paths were doing their job; we could see that we had a water free path to the back gate and to the shed and barn in an area that previously would have been under water.  

We also could see that our new patio, which had been laid to direct water away from the foundation of the farmhouse was propelling (no, I'm not misusing that term - the water flowed like a river) the rain water to the gazebo.  On Saturday afternoon, David was out in the rain beginning to put in a French Drain that would cause the water to go out into the ditch and away from our Well House and Gazebo.  

Nikki and her Fiance came for Pizza that night so that we could discuss last minute wedding plans; we only had 13 days left till the big day.  Was it all going to get done?  Would I have 4.5 hours worth of Music ready to go for the ceremony and reception?  Did we have a Sound System ready to go?  Enough chairs?  Enough tables?  Which songs would we be using for the special dances?  

Around 8 p.m., they headed home and I went back to work on the Playlists while David went upstair with a notepad and pen to write down everything that he still needed to do.....

And then......

Tuesday, March 17, 2009

Evidence of a fire~~

David spent about 3 hours yesterday hauling the insulation bundles up into the attic (before the temps outside caused him to have leave the heat of the attic).....as he did this prepping part of the job, he made a few discoveries....evidence of the old knob and tube wiring (all disconnected thank goodness) and .................evidence of a previous fire in this old house.

During last years upstairs bathroom renovation, we saw hints of a previous fire but since the P.O.'s had shared a story of a candle accident in that bathroom during a party they once held, we put it down to that. Yet, it appears that it may have been a separate incident....or a larger incident then they let on~~

Some repair and replacement had taken place where the fire occurred, but more will need to be done ~ anyone who owns one of these old homes will not be surprised that we've opened a can of worms by venturing into that attic...this is part and parcel of renovation/restoration of these places...two steps forward, one step back..............

Years ago, David restored an old home in the Riverside section of JVille that had been victim of a large fire, so he's well equipped in knowledge to take the repairs to the standard they need to meet and perhaps we'll discover more about the fire in the process....one more mystery about history~~

Wednesday, October 29, 2008

It's that time again.....

for a Project Update Post......

After months of renovation, plumbing and septic work, mudding, sanding, caulking walls and bead board, and all else that comes with a re-do....we have a bathroom again! It's not completely finished - David's working on the shelves, the new doors are curing as is the re-attached in shower towel rack; but we have running water and a toilet that flushes. Yeah! No more running down the stairs......maybe that's TMI?


Still to come - shelving above the toilet and triming out the window
with the salvaged trim from the Masters House.


The new tub doors!


The new sink, faucet, mirror and lighting fixtures....

The painting in the living and dining rooms is progressing, however, the green of the dining room became the same bronze/gold of the living room.

The bronzy-gold in the Living Room.....





Two days were spent just making the decision regarding the dining room paint color.....

First attempt at transitioning the colors......we thought that painting the dining room side of the posts would do the trick......didn't do the doorway justice.....

and we didn't like the green panels.....so we painted the panels Ben Moore's White Sands
it still didn't look just right .............



so we painted one of the posts green and left just a little bit of the bronzy gold showing
and painted the edging of the panels that same color.....


and we compared the looks....

and then expanded the paint to get a more clear idea of the final product....



After painting the trim at the end of the room which includes the dividing door to the L.R., the Harry Potter Cupboard Door (Cupboard under the stairs) and the bathroom door, David and I spent an evening living with the color...and as the evening progressed, we liked it less and less. It was just too much and despite numerous attempts at getting that dividing doorway just right, the transition wasn't working. I think part of it is that the green is not near enough to a natural wood tone and with the amount of trim and doors in that room it just didn't feel right....and it was very difficult for the eye to find a place to rest.

The decision to continue the bronzy gold from the Living Room into the Dining Room was a good one.....and five days from the start of the job, this is what we have now.....


We still have to add the new chair rail (well....salvaged new chairrail) under the the blue plate you see on the dividing wall...it's been painted and is drying as I type....and that chandelier? Well, its supposed to get a new paint job as well....black or copper....just have to make the decision! One of these days, I'll find the perfect light fixture for this room....but for now, paint will do the trick.



Then it was on to the staircase; a day was spent scrubbing and painting that....and another putting the second and third coats on.



The photo wall, which has yet to get its new coat of B. M. White Sands, now has real photos in the frames and Nikki and I are slowly making fabric mats for each one...if you look closely, you'll see the fabric mat completed in three of the photos...when completed, each photo will have either a gold, blue, green or red fabric mat......!

And the little table on the staircase wall? That one was picked up at the flea market for a very nice price.....

I just love progress! We're onto the kitchen now....the red accent walls have been primed and the first coat of the green paint is on the doors and trim....and in this room, it looks great! More photos to come.....

Tuesday, October 7, 2008

Two, no three posts in one.......

Post One - It was a quiet weekend; after a trip to a disappointing fall festival on Friday night and our arriving at not one but two ice cream shoppes just as they closed their doors, Hunter and I spent Saturday and Sunday basically just hanging out. It was David's work weekend and after the whirlwind of DIY, school activities etc...I just didn't have the energy to spend the weekend working like crazy too....

But, I did finish the bathroom painting for the most part. There are, as usual, a few touch ups remaining. I used painters tape and plastic draping to protect the bead board during the final coat of ceiling paint....and was reminded of why I don't use painters tape. Unlike the painters on those design shows, when I remove the tape, it always, and I mean always, means more touch up edging.....I do much better when I just cut in using my eyes instead of tape....but anyway...

Here's the update photo on the bathroom.....

The floor is on today's schedule.....

Post Two....Living with 100 year old pecan trees can be an interesting experience. You never really know when one of those limbs (some of them the size of small trees) are going to come down. It doesn't have to be windy; it doesn't have to be rainy; they sometimes just come on down....like this one....


I don't know if you can tell just how big this limb is; it crosses the entire front yard. We woke up to it one morning last week (confirmation of how crazy last week was, I cannot remember which day it was....). If I was any good at guesstimating feet and yards, I'd say it was at least 30 feet long.....

On the positive side of it....no one was hurt when it fell and we'll get more sunlight in the weedy portion of our front yard.....here's the gap it left in the mother tree....


Post Three....Nikki starts a new job today....she is going to be a Vet Tech at our Vet's office. Despite her lack of experience, the Doc hired her out of a quite large application pool...based upon his knowledge of her love, care and commitment to her tri-pod King. Wow, loving and caring for your fur friend despite hardship and disability has benefits other then unconditional return of that love ..........

We're very excited for our girl; servers are feeling this economic crunch probably more then anyone who actually hasn't lost their job. When money gets tight, folks just don't eat out as much and they certainly don't tip as well. Shifts are being cut to the point where Nik was sent home twice last week before even clocking on....the writing was on the wall and out she went to find another job.

Now, we're all caught up on the weekend news....except for the fact that Hunter and I overslept this morning and we're leaving for school an hour later then we should be.....oops, I wasn't going to post that part of it....just file that one under "keeping it real".

Tuesday, September 30, 2008

Making Progress.......

We're on the final push to complete the bathroom project. Our septic issue turned out to be an electrical issue and one that David was easily able to fix. This means that the plumbing can be completed (tied in to the downstairs bathroom and vented etc.) which also means that we can begin to load in the sink and toilet.......after a few more items are crossed off....like painting and floor finishing..............just a little photo walk down memory lane...............


Realizing that enough of the original floor remained to salvage it.


Beginning the process of using the salvaged bead board


The result of four days of hard prep work - the window will be trimmed in sometime this week
...the trim to be used was also part of our salvaging the Masters House.

The above photo was after four full days of stripping, mudding, sanding, caulking and priming the walls to prepare for the final painting........which will hopefully take place tomorrow. Then we will finish the floor which has been sanded in preparation. Then, its a seven day wait in order to allow the floor to cure completely....and then, the convenience will be, well, convenient once again!

The landing has been re-loaded despite the fact that there remains some touching up to do.....it took two full days to get it to the point it is, but some additional caulking and then touch ups with my brand new cutting in paint brush will finish it off (my cutting in brush went MIA in all the work that's gone on lately and I gave up trying to do a good job with the one I had.......I'll finish up as I work on the bathroom ).


The landing looks plain in this photograph, but seen in its entirety - with all the painted trim - it looks appropriately filled....the chair is another of my $5.00 finds - next on the to do list is convince my Mom to make me a slip-cover! And the window will also be trimmed in some of the salvaged trim from the Master's house.....

It's difficult to get a good shot of the landing due to its small size.....one of these days, I may be lucky enough to own a really good camera with a wide lens........


Please ignore the dirty grill.....with all the construction work going on,
it is continually in need of a good cleaning at the moment......

Friday, September 26, 2008

Project Update......

It's that time again. When David and I sit down and re-vamp our to do lists - a little process in which we determine just where we actually are in our various projects. This time, both of us would have liked to have just buried our heads in the sand......

Nikki and I spent most of the day on Tuesday putting the right color paint on the trim in the landing. I thought it would go pretty quickly but forgot that there were five 100 year old doors up there.....and I didn't think it would take three coats of paint to get the coverage right....Since I had expected one gallon to do the landing and the bathroom....the first item on the updated to do list is budget more for the paint......


Wrong Color


Right color - same door! The nice thing about this paint is that it changes hues
in the varying light of the landing - to see this, see photos below text.

On Wednesday, David spent the day mudding in the new Sheetrock in the bathroom and moving toward connecting the new upstairs plumbing to the old downstairs bathroom (which renovation was already put off until next year due to budget constraints!) only to find that we have a problem with our septic.....

It is highly likely that our 100 year old pecan and cypress trees have sent their roots into our septic tank/drain field. So now, we get to have our septic system pumped out and possibly have a new drain field put in. In the middle of an economic crisis and right before Christmas.......needless to say, the stress level in our house went up a few notches.....

But, I have to say that one of the advantages of growing older is that you handle the stress a bit better. Years ago, I would have been in tears of frustration, asking "Why us? Why now?" Today, I know that all of us have issues to deal with, all of us have things hit you broadside....and I just breathe deep and look for the solution instead of staring and screaming at the problem......

And, since I've always handled heavy stress in my life by grabbing a paint can and taking control over that portion of my life, I am about to head upstairs and grab a paint brush and roller and paint the landing ceiling......and when that is done, I'll get back in the upstairs bathroom and scrape that darn paint off the bead board and sand that Sheetrock..............if I'm not worn out by then, I'll head outside with the weed wacker and take out my frustration on the garden around the septic tank so the pumpers can get in there......and then I'll sit on the front porch and count my blessings anyway!





Saturday, September 20, 2008

Wrong Color; Wrong Directions.......

I didn't post anything yesterday. I was busy. I was very, very, busy...but I accomplished almost nothing. It was one of those days.

Yesterday was David's day off. We had plans. Big, productive plans. And while some of them were accomplished, most of the day was spent taking a step backwards.

7:20 a.m. - we're out the door to drop Hunter off at school and run some errands...a new headlamp for the truck....and we needed to hit the Fresh Meat Market to finish off the grocery shopping, we planned on hitting the paint store for the bathroom paint, and we planned on hitting some salvage yards to see about a replacement for the toilet that got smashed to smithereens this past week.....We decide to get some breakfast....we don't get much dating in anymore...so we steal moments whenever we can....the stolen moments were wonderful, the food not so much (check that restaurant off the good food list!). We hit the meat market and we go and buy the paint....but then, we realize that we need salt for the water system and a new belt for the vacuum.....so we hit Walmart....

and then we drive home...completely forgetting about visiting the salvage yards. No worries, we have plenty to do in the bathroom until we can find the hours necessary to search out a toilet.

We rush through morning chores and then get started upstairs....I grab the paint and paraphernalia and hit the outside of Hunter's door with it (we're painting all the trim in the landing to match the bead board of the bathroom)....and, it's not quite the color I thought it would be.

Maybe its the lighting? So I finish up that door and the trim around it and move to the closet door across from Hunter's room ....and while the lighting is different, the color actually looks even further from the one I had pictured....

I stop painting to eat some lunch, spend a nice 30 minutes talking to my father on the phone, and then go up to check the dried paint....it is awful. It looks like crayola yellow instead of the deep bronzed gold I was going for. I give it all a second coat hoping that that will deepen the color.......and check it again about an hour later to find it's still .....awful.


Landing Closet Door - as we drove into town, I found a spot of paint on my hand...as we drove past a median last night, I pointed out that this color looked identical to that color!


Hunter's Bedroom Door - crayola crayon yellow? Big Bird Yellow? Street Paint Yellow? All I know is it is NOT the color I thought I had picked out!



5 p.m. - Hunter's at a birthday party that ends at 6:30 - he'd gone directly from school with several other classmates. We need to return the head lamps for the truck (cuz the salesman steered David in the wrong direction!) so we plan on leaving early, going back to Benjamin Moore for the right paint color and then, if there was time, driving around looking at some old houses until picking up Hunter.

We get the right headlamps, head to Benjamin Moore - they're closed already. So we drive over the bridge and decide to make sure we know exactly how to find where the Club House where the Birthday Party was located..last year, the party had been held at the girl's home and this year, a phone call to RSVP and get directions and ending time (not included in the invitation!) revealed that the location had changed but that the new place would be found just before the entrance to their subdivision...I wrote it on down on the back of the card and had placed it in my purse for that "just in case" situation......

I had plans....to be the good mom who is never late to pick up her child.....

I had covered the possibility of getting lost by having my cell and the directions in my purse.....but, then I reached in my purse to get the card with the directions I'd gotten the previous day from the mom....to discover it wasn't there and neither was my cell phone! I'd accidentally left both of them on the kitchen table when I had taken them out of my purse to look for the headlamp receipt.....

No worries, I remembered what the mom had told me, after all, she'd told me I couldn't "miss it" since I'd been to the party last year - so we proceeded to look for the Club House.....thirty minutes later, we haven't found it - no one seems to have heard of the place and we are stressed to the max....we found the entrance to the Gated Community where they lived, but the guard has no clue as to where this club house is, and has no information about any party under the name of Hunter's classmate - it is now 6:30 and we're looking at driving 25 minutes back to our place to get the card and call to explain.

Off we go on the drive back to our place....we call the mom only to find out that she had NOT given me the complete directions...there were two entrances to their gated community and the Club House was "just before" the second one, not the one she had had us all use last year....and, that entrance was on a completely different street................we had been no where near where we should have been...............The truth is that even with the directions she had given me during my phone call to her to get said directions would NOT have helped us find the place.....but IF I'd had my cell phone, I would have at least been able to call her........

There is no real moral to this story...at least where the paint color is concerned cuz we've all watched HGTV and seen where even the professional designers have chosen a color that doesn't look the same on the wall as it did on the chip or someone has accidentally broken an essential part of a project...stuff like that happens....and we've all been steered in the wrong direction by a salesperson at one time or another.....stuff like that happens too.

But, IF I had to chose a moral, it would be this...Hosts of parties should always give complete directions on their invitations....and one should never, ever forget their cell phone!

I sure am glad today is another day................but that paint color is still awful!

Thursday, September 11, 2008

No more leak!


Our Welcome Mobile after Fay....we just discovered it was broken...
I think I like it this way just as much - photo by Nikki!

David spent the better part of the last two days on the roof getting that leak repaired and while up there, he did the attic venting for the plumbing....we're a whole lot closer to getting that upstairs bathroom done AND we're ready for the next major thunderstorm to boot...that is a good feeling!


The sled thingie....last time we used scaffolding since it was a much more involved and dangerous job....this time, ingenuity did the trick...a lot less expensive!


Venting through the attic!


This is what we got when the job was completed...a silly but happy man!

The bead board is up on one complete wall waiting to be scraped and sanded....and the belt sander is up there waiting to be used on the old flooring.....

We started sanding the floor with a regular sander but it just wasn't cutting the mustard...or the 100 years of dirt and varnish etc....so we switched the the belt sander to complete the sanding...then discovered we needed a new belt......another delay!

I'm still working on Hunter's game room....what a job. Because the landing is full of tools and bathroom things (pedestal sink, mirror, sconces, etc), there is nowhere to move the furniture to except the middle of the room.....so I'm working on a wall at a time. The most time consuming wall of his room is complete...the trim and the doors are completed as well as the wall. I've also been doing some touching up in the bedroom (remember, I ran out of the ceiling color while doing that room and am finishing it up this time around).

I'm a bit concerned about the wall color - we cut the formula 50% (of the color in the bedroom) but the shade difference is not quite what I thought it would be....this may be a temporary color if it closes the room in too much. It works in the bedroom because of the architecture of the ceiling, but the game room's ceiling is a lot lower (I don't even need a ladder or stool to cut in and I'm 5'6). I'm hoping the accents of white make it work because I really don't want to have to buy another can of paint or do the work again. Because its a boy's room, it may just work out.

Well, enough delay....time to get painting!

Monday, September 1, 2008

So how important is water to our life anyway?

David is upstairs working on the never-ending bathroom project as I type this, and the water is turned off for the job....again. The question of how important water is becomes very apparent every time this whole house re-plumb combined with a bathroom reno gets going. I can't tell you how many times in the last hour I've walked to one of the faucets to try to get some water and gone...."crap, I forgot again". There was the attempt to re-fill the coffee pot (thank goodness that the water bottles I had frozen for Faye were now thawed in the fridge! I have to have my daily requirement of cuppa's fulfilled or I become a crazy lady), then there was the daily trip outside to water down our doggie's business (that will have to wait...darn it! Can you feel my disappointment?). Oh, and the attempt to wipe down the kitchen counters after H made his lunch.....and the aborted downstairs bathroom cleanup.

On the positive side, I can sit here and type without guilt that the number of things on my to-do list are waiting for me to do them. Because without water, I just can't, can I?

And, without the water that is necessary for so many of the chores I need to do, I can rest a bit today and get ready for the next step in the bathroom reno that should start tomorrow or Wednesday....the sanding of the floor and beaded board to prep for painting. Because once this plumbing part of the job is finished, it is my turn to get in there and work.

Wednesday, August 13, 2008

What's happening in the bathroom?

The upstairs bathroom project is progressing; however, it is taking a bit longer than we anticipated...the lazy dog days of summer have intefered with the work....cookouts, beach trips, water park trips, go-carting and music at the pier have all taken precedence over the convenience of upstairs.. well... conveniences.

But progress is being made......

The new sink is purchased and fitted into the space although not yet plumbed in.

The new faucet has been set in and looked at...although not yet attached....the oval mirror has been held up to the wall and its place of prominence marked with a sharpie...as well as the sconces that will be going in as well.

We've made the decision to use the salvaged beaded board in this bathroom instead of in the delayed downstairs bathroom project......we've decided that we'll use open shelving above the comode for hand towels and other items of daily use.....we'll use the salvaged window trim around the little window...removing the marble sill (yeah!).

Now if we can just decide on a color for this little room....I really would like to use an autumn color in this bathroom....maybe a green or pumpkin color...suggestions anyone?

Sunday, July 27, 2008

The Economy and counting my blessings~~~~

I know that almost everyone else is experiencing the affect/effect of our slowing economy in various ways - in our home, the increased gas expense combined with the increase grocery expense ($4.55 for a gallon of milk/$.67 increase in the cost of a bag of shredded cheese - it all adds up) combined with the added expenses for two trips to South Carolina etc., etc., ......have resulted in a sit down for David and me to re-evaluate our renovation budget for the year.

We DIY without financing - in other words, this is our retirement investment and we aren't going into debt to make the investment. We save our money throughout each year; we use bonus and tax returns etc and each March or April, we begin whatever projects we have planned for the year.

Each year, at least one project is begun but not finished due to budget shortfalls of some sort (emergency car repairs, vet bills etc) and we've come to just accept that fact. But, this year, one project isn't even going to be started! That's a little bit harder to accept.

We've been lucky enough to have purchased some of the materials needed for the job, but since it's a bathroom that exists in an add - on to the home (done in the 1940's or 1950's we believe) it is not a project that can be begun and then left until the funding is there to complete it. I mean you can't tear down the walls and expand the footprint (square footage) and then run out of money to complete that portion of the project. And with the increased price of lumber and other construction materials, we've decided that there is just too much risk of budget shortfalls to begin the project this year.

Thankfully, our upstairs bathroom renovation WILL be completed - all the materials are purchased and slowly are being placed in that bathroom.....soon it will be functioning AND beautiful.

In times like these, I've learned to count my blessings to avoid becoming depressed by the change in plans..........

Blessings........(no particular order)

We are not in danger of losing our home as are so many others......

We can put gas in our vehicles and food on our table.....

The outdoor shower project was completed and the upstairs bathroom will soon be as well...living in sunny Florida, we'll be able to shower outside for months yet and then we'll use our beautifully renovated upstairs bath....without danger of falling through!

The roof repairs were completed and we don't have water leaking down through our living room ceiling fans any longer.....

I have new matching kitchen appliances that save us money each month on our energy bill...and look great in the process.....

The house has been completely re-plumbed (except for the downstairs bathroom) and all previous owner contracted plumbing issues resolved......

Both my parents have had their respective surgeries and are on the road to recovery....

I've been blessed with more time to live with my adult daughter and to share in the joys and stresses of her daily life.....my son is doing well in college and my youngest is still a joy in every way.........

So, despite the frustration of putting off a much needed project until next year....I am thankful for the blessings I've received THIS year......

Signing off....Lori (who will be warning guests about the soft spots in the downstairs bathroom for another year!)

Monday, July 21, 2008

Holmes on Homes

Holmes on Homes

This weekend, David and I spent a lot of time outside catching up on our weeding and trimming chores, building our raised bed for those heat resistant tomato plants we found last week and various other outside chores. The heat and the gnats, mosquitoes and flys only allowed us to stay out there for about 20 - 30 minutes at a time - once we'd reached our limits, we'd head inside for a drink, the A/C and our respective T.V's. for a chance to cool off - taking a 30 minute break before heading back outside once again.

During one of these breaks, I channel surfed to find a DIY program and happened to find this new show just as it began. The show caught my eye first of all because it dealt with a 100 plus year old farmhouse and the problems the homeowners were having with a previous renovation to their kitchen and bathroom - as they spoke of water leaking from the upstairs bathroom I felt almost a spiritual connection to them. I felt their frustration as they spoke of a pot light in the kitchen falling out of its little hole and swinging above their heads. And I cringed because I had a good idea of what would be found once Holmes and his crew began to tear out the shower and the walls.

Each time we've gutted a wall or a ceiling or pulled off baseboards and moldings, we've found something......the worst of those finds involving both water and electricity - all done in the past by contractors - and in one case structural integrity damaged by a plumber! Some of the issues were simply age and/or code related and were easy fixes.....the structural issue was the one that stopped us in our tracks and turned a 6 week tightly budgeted job into a 5 month and way over budget job. And for each issue found by Holmes and his crew, we have a story to relate.

I loved this show - as they tore apart the upstairs bathroom and revealed the illegalities of the reno (a fan/light switch on the same wall as the shower), concealed plumbing joins that legally are to be accessible, I was able to visualize some of the issues David has been finding in our house as he is gutting our bathrooms for reno. I cringed when I saw how the plumber had notched out structural beams, just as the plumber who did the work for our P.O's had done - although in this case, the structural integrity was NOT under the bathtub as it was in our house. I felt for the owners when I saw the inches of water that was found under the shower pan and in the open insides of the shower bench and I thought about the soft spots in our downstairs bathroom that grow worse all the time......

It was very interesting to watch this show just for the empathy factor - after all, I live in an old house with issues - they live in an old house with issues! But it was more then that.....I'm a hand's on learner and plumbing is one place where I've gotten little or no hands on experience - even though I wasn't standing there next to Holmes, I was watching and learning as they showed every little issue and then showed how to fix most of them. Where plumbing is concerned, David works alone.....its one of the few jobs we don't do together. Because I'm not actually working beside him and am only serving as accountant and sounding board on plumbing projects, I know that David is sometimes frustrated with me because I can't always visualize his verbal explanation or even a drawn out plan. After I watched this show, I could actually visualize our upstairs bathroom and the plumbing that David was going to be doing as the project continues. I suddenly understood what he was talking about when he spoke of venting etc.

This episode actually served to remind me of all that I have to be grateful for....as I turned off the t.v. and headed back outside, I heard that David had started working once again on the plumbing in the bathroom above me....I breathed a prayer of thanks and acknowledged how blessed I am to be married to a man who knows how to these jobs and do them right and that I'm not at the mercy of a contractor!

Saturday, June 14, 2008

Shower anyone?

The outside shower is complete! It's up and painted and has been used by everyone in the house at least once. Last week's sand from a trip to the beach was washed away outside in a nice warm shower. It was lovely not to deal with the sand on the floors and shower bottom inside! Weedwacking dirt likewise is dealt with before we enter the back door of the house!





David and I went shopping yesterday for the upstairs bathroom items; a pedestal sink, new toilet seats, tub doors, lighting etc. We were able to find a few of the items on clearance and had a couple of coupons to use so we came away quite happy with the cost of it all.

We also had a pleasant surprise once David and Hunter had finished pulling up all the flooring....the original hardwood floor is almost 80% intact in that room. We will be able to replace the wood that is rotten or missing with flooring we salvaged from the Master's House. After we hit it with Antique Restore a couple of times and some poly, we'll be able to restore that bathroom closer to it original look.

I'll be posting photos of the bathroom as it progresses, but here it is today.....


See the hardwood? The Previous Owners covered it all up with hardiboard and ceramic tile. This double layering created a large height difference between the landing floor and the bathroom. Stubbed toes were a regular occurence.


This is where the floor was rotten and the P.O.'s put down plywood and then two more layers of flooring. We can salvage this with flooring from the Master's House. We'll be insulating this floor as well.


Antique Restore will bring this floor back to its original beauty. Most of what you are seeing here is dust from the destruction.

I'm getting excited about this bathroom now....I'll continue to post photos as the work progresses!

Sunday, June 8, 2008

Construction Zone...........

The upstairs bathroom is demolished...the only thing left in there is the old bathtub and no, its not a claw foot, cast iron one but it is staying for the time being. We're working around it.

The water was turned off to that room just over a week ago, when David finished the plumbing to the kitchen (new ice maker/water dispenser) and the outside shower. So, we'd had a few days to get used to not using it before the demo began. The sink cabinet came out first....followed by the toilet and as I write this, I hear the sounds of the floor being torn up and carried out.....

We seem to live almost constantly in a construction zone. There's always something in a room that doesn't belong there...i.e. just to my left there is a pile of flooring - Brazilian something or another - that we were given to use in the new downstairs bathroom. Its been here since March and will likely be there until the end of the summer.....I've gotten to where I don't really see it anymore - although I wasn't very happy to return from SC (and Dad's surgery) to see it piled high on my office floor.

As I sit listening to David and Hunter making tons of noise, I find myself remembering a conversation that took place at a Cub Scout Planning Meeting a couple of years ago.....Since we moved down here, most of the folks that we see in our wanderings as Hunter's parents don't know that we've already raised two kids. The assumption is either that we married late or that we had a child later than most. Anyway at this meeting, all the planners were sitting and chatting while we waited for the Scout Master to come into the room. Someone asked David and I about our progress on the house and before we could open our mouths, another parent said "oh, never renovate your house, you'll get a divorce!". David and I just looked at each other and smiled...then we explained to her that we'd been married for 24 years (at that time), had three kids, ran a home repair business for a time and were constantly renovating something and were still going strong, thank you very much.

Anyway, its a good thing that we have a strong relationship since we live in a constant construction zone.......

Thursday, April 24, 2008

Windows And Walls

One of the disappointments in this old farmhouse is that the old windows were replaced by the P.O.'s; it had been part of our farmhouse dream to restore any house we might be blessed to live in AND the windows....of the 26 windows in this house only two are "original" and even those were put in cr. 1950 or so. On the pro-side of this however, is that 24 of the windows are double paned and therefore are somewhat energy efficient (if they had all been properly installed but that is another story for another day!).

Although we're replacing the downstairs bathroom this year we still want it to look as if it belongs to this old house and not a bathroom from a house you might find in our old subdivision......with that in mind, we salvaged the 1910 beadboard from the Masters House....and today, we went to a historic house in our neighboring town and purchased a set of stained glass windows for the bathroom. These large windows are from the civil war era so are a lot older than our old farmhouse, but the simplicity of the details are perfect......we also may have lucked into a vintage screen door for the front of the house.....Our front door is taller than today's doors and we thought we'd have to special order from a vintage retailer and pay about $700.00 for one....! We'll go and measure and check out the pricing on the one we've gotten wind of on Saturday......

A screen door in the front would be a great addition to our home; last evening after dinner, there was a chill to the ever present winds of this open farmland and although I wanted to watch the sun setting through the oak and pecan trees, I chose to sit inside on my couch instead...but I left the front door open to be able to still enjoy the view.....for all of 5 minutes......David suddenly came in from the kitchen saying "gnats.....all over the kitchen".....and promptly shut off my view!

Gnat season has arrived.......and I wasn't ready for it. Wish us luck on that screen door!

Wednesday, April 23, 2008

Soft Spots and Stars

When you live in a one hundred year old farmhouse, you become quite leary of soft spots.....and I just stepped in one....! No, don't panic for me...I knew this one was there.........


There have been three bathrooms in the life of this old farmhouse (since it's original outhouse days~).....my laundry room was the first one; when we moved in the 40 year old water heater sat in the remains of the concrete shower stall; that was followed by the addition of an upstairs bathroom - accomplished by the reconfiguring of the upstairs landing and then.......there was the "add-on" bathroom (1960'ish).


This downstairs bathroom and its various soft spots has a date with TNT.....well, it has a date with destruction anyway....as I write this David is outside organizing the wood we've bought and the wood we have salvaged from the Master House and getting ready to begin the project. Once he's organized that and the new plumbing stuff we bought at the Depot, he'll get started on the first steps of this year's big project....the outdoor shower!


Yep, you read that right....an outdoor shower....we had one at the old house for yard work days, beach days and just for those days when showering under the stars was appealing. Its one of the things we miss about our other place...but not for long......!


Things will be a mess around here for awhile....the upstairs bathroom is getting a new floor (the plywood is rotten from old plumbing leaks) and a tub enclosure doors (cuz shower curtains and an upstairs bathroom are not a good mix with kids), a pedastal sink and a new toilet....an antique mirror and new sconce lighting......!


Downstairs.........well, think TNT....that room is going.....going.......soon to gone. And the plumbing will be of the sort that doesn't include the downstairs toilet flushing when the upstairs one is flushed...(that brought a few shivers until we figured out it wasn't a ghost, just a plumber who was a good roofer.....) We'll start from almost scratch with that one - adding a door to the outside (no more mud covered feet and muddy hands traipsing through the kitchen and dining room after gardening or ditch playing!) , new everything in this one.....not to include any soft spots......!!


So for those of you who've visited and been advised to "yell if you fall through"......soon, my friends....soon.....a safe floor, a lovely sink, a huge shower.......and salvaged beadboard from a now destroyed farmhouse just down the road! And for those "hippies" among us, if you stay the night you can choose to shower beneath the stars!

LinkWithin

Related Posts Widget for Blogs by LinkWithin